Hardware Verification Results — PHR-1 + SNIC
Live measurement data from NexusOS hardware proof-of-concept builds in Australia (2026). Results are published within 24 hours of each successful test run. All measurements verify predictions from the Theory of Compression States and CE_TABLE encoding.
PHR-1 Bifilar Resonator Results
The PHR-1 is a 144-turn bifilar coil wound to specific geometry derived from Λ=hf/c² equations. Measurements target: standing electromagnetic wave patterns consistent with CE_TABLE band predictions. Pass criterion: field geometry within ±5% of predicted values at visible-light-equivalent resonant frequencies.
SNIC Optical Demonstrator Results
The SNIC optical bench demonstrator uses bandpass filters selected to match CE_TABLE wavelength bands. Measurements target: wavelength-selective channel separation within ±2.000 nm of CE_TABLE predictions for each of the 128 spectral bands. Pass criterion: all tested channels within tolerance simultaneously.
Measurement Protocol
- Every test step has a defined tool list, measurement procedure, and pass criterion
- Each run is video recorded end-to-end (no editing)
- Data published in raw form within 24 hours — no post-processing before publication
- Failed runs published alongside successful ones